2017년 3월 9일 목요일

Operations Management 생산운영관리 krajewski ritzman malhotra 15장 연습문제풀이 - 석사논문

From : http://www.needreport.com/index.php?document_srl=390507
Operations Managemen.hwp

해당 자료는 해피레포트에서 유료결제 후 열람이 가능합니다.
분량 : 5 페이지 /hwp 파일
설명 : Operations Management 생산운영관리 krajewski ritzman malhotra 15장 연습문제풀이

4. The Donald Fertilizer Company produces industrial chemical fertilizers. The projected manufacturing requirements (in thousands of gallons) for the next four quarters are 80, 50, 80, and 130, respectively. A level workforce is desired, relying on anticipation inventory as a supply option. Stockouts and backorders are to be avoided, as are overtime and undertime.

9. The Mowry Machine Shop still has five jobs to be processed as of 8 A.M. today (day 23) at its bottleneck operation. The day when the order arrived, processing time, and promised due dates are given in the following table. The jobs are listed in the order of arrival.

14. Little 6, Inc., an accounting firm, forecasts the following weekly workload during the sax season:

Operations Management 생산운영관리 krajewski ritzman malhotra 15장 연습문제풀이

4. The Donald Fertilizer Company produces industrial chemical fertilizers. The projected manufacturing requirements (in thousands of gallons) for the next four quarters are 80, 50, 80, and 130, respectively. A level workforce is desired, relying on anticipation inventory as a supply option. Stockouts and backorders are to be avoided, as are overtime and undertime.

9. The Mowry Machine Shop still has five jobs to be processed as of 8 A.M. today (day 23) at its bottleneck operation. The day when the order arrived, processing time, and promised due dates are given in the following table. The jobs are listed in the order of arrival.

14. Little 6, Inc., an accounting firm, forecasts the following weekly workload during the sax season:

출처 : 해피레포트 자료실

댓글 없음:

댓글 쓰기

가장 많이 본 글