| 해당 자료는 해피레포트에서 유료결제 후 열람이 가능합니다. |
| 분량 : 9 페이지 /xlsx 파일 |
| 설명 : Operations Research Wayne L. WinstonIntroduction to Mathematical Programming : Applications and Algorithms엑셀풀이Operations Research Wayne L. WinstonNetwork Models 연습문제 엑셀풀이Introduction to Mathematical Programming : Applications and Algorithms |
| 8.2-1 Find the shortest path from node 1 to node 6 in Figure 3.8.2-6 It costs $40 to buy a telephone from the departmentstore. Assume that I can keep a telephone for at most fiveyears and that the estimated maintenance cost each year ofoperation is as follows: year 1, $20; year 2, $30; year 3,$40; year 4, $60; year 5, $70. I have just purchased a newtelephone. Assuming that a telephone has no salvage value,determine how to minimize the total cost of purchasing andoperating a telephone for the next six years.8.2-7 At the beginning of year 1, a new machine must bepurchased. The cost of maintaining a machine i years old isgiven in Table 5.The cost of purchasing a machine at the beginning ofeach year is given in Table 6.There is no trade-in value when a machine is replaced.Your goal is to minimize the total cost (purchase plusmaintenance) of having a machine for five years. Determinethe years in which a new machine should be purchased.Seven types of packages are to be delivered by fivetrucks. There are three packages of each type, and thecapacities of the five trucks are 6, 4, 5, 4, and 3 packages,respectively. Set up a maximum-flow problem that can be8.3-6 Seven types of packages are to be delivered by fivetrucks. There are three packages of each type, and thecapacities of the five trucks are 6, 4, 5, 4, and 3 packages,respectively. Set up a maximum-flow problem that can be used to determine whether the packages can be loaded sothat no truck carries two packages of the same type.8.3-7 Four workers are available to perform jobs 1–4.Unfortunately, three workers can do only certain jobs:worker 1, only job 1; worker 2, only jobs 1 and 2; worker3, only job 2; worker 4, any job. Draw the network for themaximum-flow problem that can be used to determinewhether all jobs can be assigned to a suitable worker.8.5-4b Each year, Data Corporal produces as many as 400computers in Boston and 300 computers in Raleigh. LosAngeles customers must receive 400 computers, and 300computers must be supplied to Austin customers. Producinga computer costs $800 in Boston and $900 in Raleigh.Computers are transported by plane and may be sent throughChicago. The costs of sending a computer between pairs ofcities are shown in Table 34.8.5-5a, b Oilco has oil fields in San Diego and Los Angeles. TheSan Diego field can produce 500,000 barrels per day, andthe Los Angeles field can produce 400,000 barrels per day.Oil is sent from the fields to a refinery, in either Dallas orHouston (assume each refinery has unlimited capacity). Torefine 100,000 barrels costs $700 at Dallas and $900 atHouston. Refined oil is shipped to customers in Chicagoand New York. Chicago customers require 400,000 barrelsper day, and New York customers require 300,000 barrelsper day. The costs of shipping 100,000 barrels of oil (refinedor unrefined) between cities are shown in Table 35. |
| 출처 : 해피레포트 자료실 |
2017년 3월 9일 목요일
Operations Research Wayne L. Winston Introduction to Mathematical Programming : Applications and Alg - 파일
From : http://www.needreport.com/index.php?document_srl=390497
댓글 없음:
댓글 쓰기